Saturday, March 9, 2013

SPACE KL:SBA 2126 Semester 2

Background Studies, Site Analysis and Design Development 



Proposed site for the project at FRIM near Kuala Lumpur

Proposed Site for the project

Lecture input on Sustainable Design 31 Mac 2013

Students concentrating on the lecture given 31 Mac 2013

Some development on the site analysis 31 Mac 2013

Design development 31 Mac 2013

Design development 14 April 2013

Design development 14 April 2013

Design development 14 April 2013

Design development 14 April 2013

No comments:

Post a Comment